BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//TYPO3/NONSGML Calendarize//EN
BEGIN:VEVENT
UID:calendarize-stoerungen-und-ausfaelle-in-der-kaelteversorgung-campus-we
 chloy
DTSTAMP:20260702T135834Z
DTSTART:20260707T060000Z
DTEND:20260709T160000Z
SUMMARY:Disruptions and outages to the refrigeration supply\, Wechloy camp
 us
DESCRIPTION:Work to be carried out:\nInstallation of additional refrigerat
 ion systems \nCampus\, buildings:\nWechloy Campus\, Buildings W01–W04\, 
 W15\nTimeframe:\n7 July 2026\, 08:00 to 9 July 2026\, 18:00\nDisruptions:\
 nOutages in the cooling supplyThis affects\, amongst other things\, cold r
 ooms\, laboratories and the cooling systems for ventilation and air-condit
 ioning units Cold stores and cold rooms must be kept closed.Laboratory wor
 k (experiments) requiring cooling or a cold supply cannot take place durin
 g the period mentioned.An emergency refrigeration supply has been set up t
 o ensure the refrigeration supply for systems essential to building operat
 ions\, such as the Data Centre.\nIf you have any questions\, please contac
 t:\nAlexander Koch (Division 4 – Facility management)Anton Kessler (Divi
 sion 4 – Facility management)
X-ALT-DESC;FMTTYPE=text/html:<p><strong>Work to be carried out:</strong></
 p>\n<ul type="disc"><li data-list-item-id="e774b479b5089fb57f32bda965a170c
 3f"><span>Installation of additional refrigeration systems </span></li></u
 l>\n<p><strong>Campus\, buildings:</strong></p>\n<ul type="disc"><li data-
 list-item-id="ea418570fe8fb6fdca7a993e756e6a1d1"><span>Wechloy Campus\, Bu
 ildings W01–W04\, W15</span></li></ul>\n<p><strong>Timeframe:</strong></
 p>\n<ul type="disc"><li data-list-item-id="e6e5a1af72dea6b527e13219164f9fd
 5c"><span>7 July 2026\, 08:00 to 9 July 2026\, 18:00</span></li></ul>\n<p>
 <strong>Disruptions:</strong></p>\n<ul type="disc"><li data-list-item-id="
 e4690cde1e45e769edfbe041d117f95b8"><span>Outages in the cooling supply</sp
 an></li><li data-list-item-id="ec753b6d3ca54ccf089d0635dcc7d26b2"><span>Th
 is affects\, amongst other things\, cold rooms\, laboratories and the cool
 ing systems for ventilation and air-conditioning units</span><br> <ul><li 
 data-list-item-id="e1f938122f2df165388bff34c0c286450"><span>Cold stores an
 d cold rooms must be kept closed.</span></li><li data-list-item-id="ed01d4
 7a7f9af8db6385d069705600b25"><span>Laboratory work (experiments) requiring
  cooling or a cold supply cannot take place during the period mentioned.</
 span></li><li data-list-item-id="e6f759f706e512d8d76d0fa9732c97114"><span>
 An emergency refrigeration supply has been set up to ensure the refrigerat
 ion supply for systems essential to <u>building operations</u>\, such as t
 he Data Centre.</span></li></ul></li></ul>\n<p><strong>If you have any que
 stions\, please contact:</strong></p>\n<ul><li data-list-item-id="ed384dfe
 b9c9caa523be5bf9230513292"><a href="https://uol.de/suche/person/AKoch5"><s
 pan>Alexander Koch</span></a><span> (Division 4 – Facility management)</
 span></li><li data-list-item-id="e5803808b2ada18644ea91cc42bb95497"><a hre
 f="https://uol.de/suche/person/AKessler2"><span>Anton Kessler</span></a><s
 pan> (Division 4 – Facility management)</span></li></ul>
LOCATION:
END:VEVENT
END:VCALENDAR
