10 years VorWind
10 years VorWind
ForWind: Centre for Wind Energy Research celebrates its tenth anniversary
Oldenburg, 18 February 2014. To bring together research into wind energy and to promote the knowledge transfer between academia, industry and politics – it was with this aim in mind that the Centre for Wind Energy Research, ForWind, was launched in 2004. At that time, nine research groups from the Universities of Oldenburg and Hanover joined forces. In 2009, the University of Bremen joined the centre. Today, ForWind comprises a total of 28 research groups with almost 300 staff across its three sites. They conduct engineering and physics research across all areas of wind energy.
ForWind is today celebrating its tenth anniversary with a ceremony in the lecture centre at the University of Oldenburg, looking back on a period of dynamic development. Guests include the Lower Saxony Minister for Science and Culture, Dr Gabriele Heinen-Kljajic; Prof. Dr Katharina Al-Shamery, Vice-President for Research at the University of Oldenburg; Prof. Dr.-Ing. Erich Barke, President of Leibniz University Hannover, and Dr Martin Mehrtens, Chancellor of the University of Bremen, as representatives of the participating universities, as well as numerous figures from the worlds of politics, business and academia.
“The ForWind research network is providing significant impetus for the future of renewable energy,” said Lower Saxony’s Minister for Science and Culture, Dr Gabriele Heinen-Kljajic, on the occasion of the organisation’s tenth anniversary. “With its strong international commitment and close co-operation with partners from academia and industry, ForWind has helped the north-west to develop into a leading centre for wind energy research.”
Research into renewable energies has a tradition stretching back more than 30 years at the University of Oldenburg, emphasised Al-Shamery during the celebrations. “ForWind – founded with the support of the State of Lower Saxony – is an excellent example of how activities and expertise can be pooled through strong co-operation. A sustainable energy supply from renewable sources is a key challenge of our time. Through ForWind, the universities of Oldenburg, Hanover and Bremen are taking responsibility for overcoming this challenge,” said Al-Shamery.
Ten years after its foundation, ForWind has established a firm foothold in the national and international research landscape. For example, its researchers are working on research projects relating to the major offshore wind farms ‘Alpha Ventus’, ‘EnBW Baltic 1’ and ‘BARD Offshore 1’, and are contributing as experts to numerous specialist committees. Together with the German Aerospace Centre (DLR) and the Fraunhofer Institute for Wind Energy and Energy System Technology (IWES), ForWind founded the “Wind Energy Research Network” last year. It brings together more than 600 scientists who are tackling pressing issues in onshore and offshore wind energy through large-scale projects – ranging from wind as a resource, through individual wind turbines and their components, to the interaction of turbines in large wind farms and their integration into the energy supply system. To this end, they have access to a research infrastructure comprising test centres and laboratories that sets global standards.
Alongside numerous research projects, ForWind has continuously expanded its infrastructure: in 2012, the foundation stone was laid for the globally unique ‘Test Centre for Support Structures’ at the University of Hanover. In the test hall, which is around 20 metres high, ForWind scientists aim to simulate conditions on the high seas and test components of offshore wind turbines that are true to the originals. The aim is to extend the service life of wind turbines, reduce production costs and make the support structures even safer. The investment in the test centre amounts to around 25 million euros.
In Oldenburg, scientists have been using their own supercomputer since 2010, which enables highly complex and precise calculations of the flow around rotor blades and entire wind turbines, as well as the flow within wind farms. In 2012, the German Council of Science and Humanities endorsed the construction of a research laboratory for turbulence and wind energy systems at the University of Oldenburg. At the heart of the new building, which covers 2,300 square metres and costs around 21 million, will be a turbulent wind tunnel. Its long measurement section is intended, amongst other things, to enable the experimental investigation of the interaction between several wind turbines operating in a grid. The measurements help to increase the efficiency of wind farms and to avoid technical and financial risks.
A 180-metre-high wind turbine in the Bremen Industrial Park was commissioned by the University of Bremen in 2012. Here, ForWind researchers can carry out research projects on the performance, service life and environmental compatibility of wind turbines. Also in Bremen, a ‘Laboratory for Large-Scale Gear Measurements’ – the only one of its kind in Germany – has been established to analyse new and defective gearbox gears from wind turbines. In this way, the researchers aim to investigate the relationship between the design, manufacture, quality and functional properties of large gear systems and their effects on wear, service life, types of damage and noise levels.
In addition to high-level wind energy research, ForWind offers training and further education for future scientists, engineers, specialists and managers, and is actively involved in the field of knowledge transfer. The spectrum ranges from information services for the interested public, through specialist seminars at the ForWind Academy, to part-time and undergraduate degree programmes in wind energy.