News from PPRE / Oldenburg University

Follow us!

PPRE on LinkedIn

PPRE on Instagram

Questions about PPRE/EMRE and application procedure

Astrid Bohemann
Application and Administration Support

+49 (0)441-798 3544

Programme Coordinator

Edu Knagge

+49-441-798-3544

Mon - Thu

PPRE/EMRE (Core Oldenburg)

Dr. Herena Torio
Programme Manager

+49 (0)441-798-3546

Director

Prof. Dr. Carsten Agert

Address
University of Oldenburg
School of Mathematics and Science
Institute of Physics
D-26111 Oldenburg
Germany

News from PPRE / Oldenburg University

  • 40 feet battery energy storage container with Li-ion batteries

Practical Experiences gained in Battery Energy Solutions Systems during PPRE-Studies

Sameer Sharma (PPRE 18/20) from India together with Tarikua Mekashaw (PPRE 17/19), Ana Fonseca (PPRE 17/19), Apoorv Pareek (PPRE 16/18) and also Muhammad Adnan (EMRE 2018-19), did his internship + master’s thesis with RWE Battery solutions GmbH (Ex. BELECTRIC GmbH) in Dresden, one of the most beautiful and touristic cities of Germany. Right after finishing their thesis projects both, Sameer and Muhammad, got permanent employments at RWE Battery Solutions GmbH.

There has been a wonderful collaboration between PPRE and BELECTRIC GmbH over the past few years. Hans Holtorf’s visit to Dresden and one-on-one meeting with supervisors at BELECTRIC has resulted in a strengthening of relationships between BELECTRIC’s staff and PPRE.
RWE Battery solutions GmbH (formerly known as BELECTRIC GmbH) is a daughter company of the German multinational energy and utility group RWE AG. It provides standalone and PV-coupled battery energy storage solutions to UK, Europe, Americas and Australia. It generates and trades electricity in Asia-Pacific, Europe and the United States. In the year 2020, RWE AG group was ranked 297th in Forbes Global 2000 and it is one of the top 30 German companies listed in DAX (Deutscher Aktienindex - German stock index). 

Concrete lessons learnt by Sameer: To design a Battery Energy Storage Solution (BESS) for PV parks and as a stand-alone system. 

Job responsibilities taken: 

  • Preparing Single Line Diagrams (SLDs) of BESS. 
  • BESS capacity sizing and cost calculations. 
  • Preparing BESS project layouts.  

Further info:  and here

(Changed: 19 Jan 2024)  | 
Zum Seitananfang scrollen Scroll to the top of the page