At the 19th VP-V project portfolio board meeting...
...the project "Introduction of a maintenance tool for technical equipment and buildings" was completed. The project aimed to inventory the various maintenance activities and professionalise the area. The project ran from 2020 to 2025.
...the project "Introduction of a standardised system for managing locking rights" was completed. The aim of the project was to standardise the various systems that control access to buildings and to expand the basis for digital locking, which will be given greater consideration in future. The project ran from 2019 to 2025.