Work step 12

Contact

A4 Room 0-009

+49(0)441 798-5386

+49(0)441 798-2967

Work step 12

Simple

I place the workpiece on the plate.
I turn the countersink in the hole.

Medium

Place the workpiece with the hole on the steel plate with hole.
Rotate the hand countersink in the hole on both sides.

Heavy

The next step is to deburr the drill hole using the hand countersink. To do this, the hand countersink is rotated in the drill hole from both sides.

(Changed: 11 Feb 2026)  Kurz-URL:Shortlink: https://uol.de/p114342en
Zum Seitananfang scrollen Scroll to the top of the page

This page contains automatically translated content.